North West Shelf LNG Expansion Project
Front end engineering design contract
Woodside has announced the commencement of front end engineering design for the
proposed expansion of the North West Shelf LNG Project.
This follows completion of feasibility work on the expansion and approval by the Joint
Venture Participant...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
North West Shelf Project - Second Trunkline Project
Woodside, on behalf of the North West Shelf Venture (NWSV) Participants, has for some
time being planning the development of a second offshore trunkline as part of the
integrated expansion of the North West Shelf Gas Project.
In the past, Woodside indicated the timing of fabrication a...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Legendre/Legendre South Oil Fields
Woodside''s June 1998 Half-Yearly Report said the Legendre South-1 well in the Dampier
Sub-Basin, encountered a 21-metre hydrocarbon column and is considered a new pool
discovery.
The well has confirmed the development potential of the Legendre/Legendre South oil
accumulations an...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Scott Reef/Brecknock Gas/Condensate Fields
Woodside''s June 1998 Half Yearly Report said studies have confirmed there is a range of
economically and technically viable development options for the large gas/condensate
resources contained in the Scott Reef and Brecknock fields in the Browse Basin.
More in-depth conceptual studie...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Nifty Copper Operation
Nifty Underground
Straits Resources'' Development Manager - WA,
Peter Storey, said the feasibility study on developing the underground primary sulphide
resource at its recently acquired Nifty copper operation is unlikely to commence until the
second half of 1999.
In the prec...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Cape Peron Gypsum Project
Cape Peron Gypsum Pty Ltd, a Shark Bay Resources subsidiary, proposes to mine gypsum on
the Cape Peron peninsula, 37 kilometres north of Denham.
The gypsum deposit is on vacant crown land surrounded by the Francois Peron National
Park and has almost 13 million tonnes in resources wit...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Dowerin Wheat Mill
Dowerin Pasta Company (DPC) has been established by a group of farmers, and is
proposing to establish a wheat mill in Dowerin to produce pasta for the export market.
At a total project cost of $40 million, the mill would have the capacity to process
45,000 tonnes per annum of durum wh...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
ANZAC Class Logistics
The ANZAC Class Logistic Office - WA has provided the following
information on the logistic support environmental for the ANZAC Class ships and
facilities.
Background
In the early 1990s, the Royal Australian Navy (RAN) concluded that the
new Collins Class Submarines and ANZA...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Syerston Nickel-Cobalt Project, NSW
Uranium Australia said the Syerston nickel-cobalt projects pre-feasibility study
has been completed.
Fluor Daniel carried out the study with assistance from its subsidiary,
Signet Engineering.
The study involved examining the various mine operating and processing
para...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
RGC's Murray Basin Mineral Sands Project, Vic
RGC said on the basis of an indicated resource of 32.5 million tonnes
averaging 18.5 per cent heavy mineral, a pre-feasibility study was initiated to examine
the commercial exploitation of the Koolwin, Woornack and Rownack deposits.
The study was based on dry mining the ore to feed a ...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Cogeneration Plant, Qld
TransAlta Energy (Australia) and AGL Power Generation said they would
build a $110 million, 150-megawatt co-generation facility, to be located at QNI Limited''s Yabulu nickel and cobalt refinery near Townsville.
The proposed facility will provide electricity and steam for QNI=s refinery, a...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
Marlborough Nickel Project, Qld
Preston Resource''s Marlborough nickel project has been designated Major
Project status by Queensland Deputy Premier Jim Elder.
Mr Elder said with the Major Project status, the Department of State
Development will co-ordinate activities within the State Government and with other
...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|
REPS Directory/Advertising
REPS members will be aware that as part of their subscription to the
service, a half-page company profile is provided in the annual WA Resource Development
Services Directory, which is published in January.
In addition to providing information for their entry, many companies
also...
Member and/or subscriber access only. Call (08) 9365 7455 for password help or click here to login.
|
|